|
On Site Services: Installation of OLE Products & Equipment in UK & Ireland |
|
|
|
|
Written by Administrator
|
|
Wednesday, 21 November 2007 |
|
OLE offer full service for the supply and / or installation of the following services throughout the UK and Ireland. Supply and Installation of Tank Gauges, Local and Remote Tank Gauging Systems (SMS or www.Remote System Tank Monitoring Equipment Installation).
Maintenance Services: We offer a full preventative and reactive maintenance programmes for our products and systems provided by our company. Options of 24 hour attend site, Three day attend site, Five day attend site, and Seven day attend site, are available. (24 hour = UK mainland only).
Plant Shutdowns and Power Stations: OLE Ltd offer Pressure and Temperature Calibration Facilities: Fully qualified teams of service engineers can carry out shut-down / outage calibration works on a wide variety of instrumentation and tank gauges including: Pressure calibrations. Rosemount / Fuji / Siemens / Yokagowa / Barton / Foxboro.
Temperature calibrations. All makes of RTD and thermocouple systems.
PLC's and loop testing services are also provided.
Tank Gauges | Tank Monitoring Systems | Chichester | UK
|
|
Last Updated ( Monday, 15 August 2011 )
|